Skip to content
VECTOR_TEXTURE_6

Penn Engineering Case Study

IFP_KP400_PENN ENGINEERING

 

 

How Penn Engineering Virtually Eliminated Solvent Costs While Cutting Labor in Half

Producing roughly 5 million precision fasteners weekly, their legacy parts washing system had become unsustainable, consuming over 100 barrels of solvent annually and requiring around-the-clock operation across three shifts. After implementing the iFP Clean KP.400 vacuum degreasing system, they reduced solvent use by 99%, cut operating time from three shifts to just one (finishing by mid-afternoon most days), and achieved consistently cleaner, drier parts with no post-wash processing.

Download to Read Full Penn Engineering Case Study